Cleaned the rear bearings and installed new seals so the disks are now mounted. The rear calipers should be delivered tomorrow. Had to clearance the passenger Reid knuckle for the caliper bracket to fit. Need to get some inner spindle seals before I can mount the spindles. I thought I had a couple but can't find them. I also mounted the master cylinder and we cut the spacers for the power steering pump bracket.
I'm trying to decide if we should run the factory power steering pulley (5.25 inch) or get the PSC pulley (6.5 inch). Seems to me the factory one would keep the pump spinning faster and the pressure up at lower rpm. Any thoughts?
Also welded in the rear cross member with a suck down winch mounted to it and tighten down all the control arm bolts.
Not too bad for only being in the shop 3 hours. Sorry no pictures today. Maybe I can run out a d snap a few this evening after all the kid activities finish. There probably won't be and progress this week as my wife is traveling so I have the baby and 5 year old.
Sent from my SM-G950U using Tapatalk