I want to finish my jeep. It is with this in mind that I am sending this out.
I sent an email out to a member but have not heard back so I am going to ask for help this way.
My problem is simple I do not know what/how to measure and perform the job needed to fix my vibrations in my driveshaft and install an SYE setup (or even if I should). I still don't get it or really understand how to. I do not want to go cutting the transfer case, or increasing the length of the driveshaft (Associated Truck in Newark, if needed is a place I found) because I want it done right.
I understand that it is about driveline angles and binding but I still do not get it.
My 1996 ZJ is lifted with 6 inches total 4" springs 2" spacers
4.0 liter
Automatic Selec Trac
NP 242 Transfer Case
Is there anyone with the knowledge and time that would be willing to help me figure / perform this task. I will pay them in either Beer, good Whiskey (don't have to share with the spouse ) / or cash money), and I would like to help and learn. So if this is something someone is interested in doing let me know. I live in Middletown and will come to you .
John Gill
JGillRN96
JGillRN96@yahoo.com
302-650-0782